Flexibility in our project management allowed for a staged installation as areas were finished, to ensure that the seats were available as soon as possible, notwithstanding the various challenges encountered in situations like this.
With 300 fixed seats, 37 moveable seats and 316 loose (linked) seats, this was a substantial project requiring the coordination of a large number of interested parties, who came together to ensure a successful outcome.
While we would hope that there are no issues with any of the seats, there is always the possibility of damage occurring so that a Spares Package allowing for a range of replaceable items ensures that in the unlikely event of a problem occurring, that the issue can be easily resolved. With low-maintenance seats and high-quality installation, concerns are minimised, but as part of the handover process, instructions are given to the School Team as to what to look out for, basic day-to-day maintenance (hopefully rarely needed) and contact details of Profurn Team members in case of an issue.
At the end of an installation like this, we take great pride in seeing the results of the efforts by the architects, design team, theatre consultants, builders, school representatives and all of the other people who assist in the creation of an auditorium and bringing to life the vision of all concerned. We look forward to it providing comfort and pleasure to all the attendees at the range of events it will host for many years to come.